Challenges are inevitable but as shown by the delivery of SolarWinds Vancouver project, any hurdle can be overcome with great communication and a dedicated, experienced team working together against it
Over 12 weeks, the SolarWinds project presented Vestacon with various challenges, such as lighting with exceptionally long-lead times, detailed coordination of electrical and architectural details as well as floating drywall bulkheads requiring consultation with a Seismic Engineer. This colourful 6,000 square foot office which features local artwork, makes a memorable impression on everyone who sets foot in it
- Client SolarWinds
- Size 6,000
- Sector Technology
- Designed By IA Interior Architects / Iredale Architects
- Project Manager Optum+
With a strict deadline and many challenges, this project required constant communication between the design team and Vestacon to ensure completion according to schedule.
Project Features
- Bulkhead with linear lighting that goes along the interior offices
- Wall graphics of local Vancouver areas
- Modern style kitchen
- Floor finishes: polished and sealed concrete, carpet and vinyl