TD PWM Ottawa

Location: 360 Albert Street, Floor 16, Ottawa

Great communication is key when faced with project challenges in another city

To ensure high-quality construction management was delivered for TD PWM in Ottawa, Vestacon placed a full-time Site Supervisor in our Capital, with the remainder of the Vestacon team working remotely from Toronto and frequently visiting the construction site. We encountered issues such as slab with a huge deflection which required further structural review and change of material to complete floor leveling and tile installation. By pre-ordering long-lead items such as a custom table, Vestacon worked close with Client and Consultants to ensure construction completion within 18 weeks

  • Client TD PWM Ottawa
  • Size 16,000
  • Sector Financial
  • Designed By HOK
  • Project Manager BGIS
Previous arrow
Pause Play
Next arrow

This project taught us to always review structural to ensure correct material and specifications are correct when preparing for floor leveling.

Project Features

  • Custom made table
  • Wood wall feature in the front of house area
  • Full renovation of the elevator lobby
  • Custom made metal frame with glass inserts to act as a divider
  • Open office space
  • Front of house was separated by doors from the back of the house, in order to be used as client-facing space
  • Motorized drapery